it takes 20 people 24 days to build a barn. in how many days will the barn be built if they had 32 people working

Respuesta :

bluevortexwitepower bluevortexwitepower
  • 02-02-2019

Answer:

15 days

Step-by-step explanation:

Number of ppl it takes to build a barn in 24 days=20

Time it will take 32 people to build the barn=24*20/32=15 days

Answer Link

Otras preguntas

this picture is a scale drawing of a basketball court and 1 inch on the picture represents 15 feet of actual length. the dementions of the scale drawing are 2 i
what do 6, 9, and 12 all go into
How did the Constitution overcome the weaknesses of the Articles of Confederation? The new plan of government centralized power in the federal government at the
A wave with a frequency of 0.5 Hz and a speed of 10 m\s has a wavelength of..
why did the air with ice with ice move down?
why did Christopher Columbus use a telescope
Please guys can you help on this word problem I'm stuck on it
BMI is used to screen for
What did the acquisition of territory in 1803 between the United States and France become known as?
Explain why viruses are not included in the biological classification system.