jprameshjoel74 jprameshjoel74
  • 01-05-2020
  • Mathematics
contestada

If one man can complete a work in 85/7days. In how many days 5 men can
finish this work?

Respuesta :

tiannac23
tiannac23 tiannac23
  • 01-05-2020

Answer:

17/7 days will be the answer

Step-by-step explanation:

Ver imagen tiannac23
Answer Link

Otras preguntas

Which question relates to finding the theme of a text? What happens first in this story? What do the characters experience? What is the setting of the story? W
It seems that bacteria and molds should grow well in jam. It's extremely high in sugar, a substance many cells can use for energy, and contains enough other nut
What orbital type is being filled throughout the transition metal B Groups?
Fill in the blank with the correct word. “BRRRRRRING” as the morning school bell ____. A) Rang B) Rung C) Wrung D) Rings
How can Pfizer follow Method in having a green business?
Find the value of x. (7x - 3)
Wine goes bad soon after opening because the ethanol (CH,CH,OH) in it reacts with oxygen gas (0.) from the air to form water (110) and acetic acid (CH,COOH), th
Express 108kpa in torr, 0.975 bar in atmospheres, 22.5kpa in atmospheres, and 770 torr in pascals
Magnesium occurs in seawater to the extent of 1.4 g magnesium per kilogram of seawater. What volume of seawater, in cubic meters, would have to be processed to
Need help with this