jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

graph y=3sinx and y=sin 3x on the same axes. label the graph of each function.
where will you find maximum rate of evaporation - ocean, pond or an aquarium? Give reason to support your answer.
Which ancient civilization is associated with the Twelve Tables, an extensive road system, and the poets Horace and Virgil?
Rachel and David share 40 biscuits between them in the ratio 2:3, How many biscuits do they each get?
How many flags are in this wolld ;)
Find 4 consecutive odd integers where the product of the two smaller numbers is 64 less than the product of the two larger numbers.
Earth is a close approximation of a natural closed system.  What are some ways that living in a closed system affects each of us.
List all the commonwealth games mascots from 1982-2014
Which expression can be used to change 75 kilometers per hour to meters per minute?
Perimeter of a square with an area of 81cm2