When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

PLEASE HELP IM REALLY CONFUSED !!
What is the inverse of X^2-2x+3
What is process addiction
Many people use alcohol__________ A. To improve driving skills B. For a balanced diet C. To deal with stress D. For a better perception while driving
What does the candle symbolize in this excerpt from Leo Tolstoy’s The Death of Ivan Ilyich?
anyone please help me
What kind of figurative language is being used in the following sentence? The beautifully wrapped gifts arranged under the tree called to me, their bows whisper
What is the answer to ¿Le gustaría algo más?
Given the sequence in the table below, determine the sigma notation of the sum for term 4 through term 15. n | an 1 | 5 2 | −10 3 | 20
What is the slope of a line that is perpendicular to the line whose equation is 0.5x−5y=9