nmartin7537 nmartin7537
  • 04-01-2021
  • Mathematics
contestada

It takes 5 men 12 days ro complete a job how many days does it take 3 men to complete the job

Respuesta :

eloo59980
eloo59980 eloo59980
  • 04-01-2021

Answer:

5=12

3=? then Criss cross it and you will get 12*3 divided by 5 then you get 7.2

so the answer will be 7 days

Answer Link

Otras preguntas

Who was the 11th president of The United States Of America?
Estimate the integral ∫6,0 x^2dx by the midpoint estimate, n = 6
The intent to harm another, either physically or psychologically, is referred to as
Rachel and Hugo sorted 236 crayons into boxes for a local arts project. Each box had 10 crayons. How many crayons were left over?
What do large numbers of people form when they come together?
what are the common multipliers for 10/20 and 30/60
Birdseed costs ​$0.57 a pound and sunflower seeds cost ​$0.87 a pound. Angela​ Leinenbachs' pet store wishes to make a 40​-pound mixture of birdseed and sunflow
In 1840 china signed unequal treaties primarily to
Suppose that today the euro exchanges for $1.60. next week the euro exchanges for $1.70. it is clear that:
The value of t can be determined by using the expression 2.75s. Which table represents the relationship between the values of t and s?